Gypsum board diaphragm ceilings shall be in accordance with section 2508 5.
Roof diaphragm blocking.
If this were framed the way i would typically do it the unblocked but staggered roof diaphragm would have 240 allowable shear where with their method it would be 180.
The three major parts of a diaphragm are the web the chords and the connections.
In irc table r602 3 1 at right blocking between roof trusses is required to be fastened to the top plate with three 8d 2 long x 0 113 diameter toe nails.
Similar changes to 2306 3 for shear walls.
I think on a typical residential roof the rafter and certainly the truss is the primary bending resisting member and that the osb sheathing is the diaphragm element as long as rafters and blocking keep the diaphragm from buckling and properly transmit the load components up into the diaphragm.
Since the individual pieces of.
2306 2 4 gypsum board diaphragm ceilings.
Which a blocked diaphragm can be designed are many times greater than those for diaphragms without blocking.
There is an unquantified load path resistance interaction present.
Only lumber blocking shall satisfy blocked diaphragm requirements.
The 200 pounds of uplift force allowed by the irc does not take into account the nailing between the trusses the blocking and the top plate when blocking is provided.
For 1 2 inch panel maximum span shall be 24 inches.
It also states you could stagger the blocking in a blocked diaphragm allowing vents every other truss bay.
It is important however to understand that this blocking creates the structural boundary members for the roof diaphragm and it is not optional.
Shear forces acting on heel block the building designer may not assume that prescriptive heel blocking will perform adequately as perimeter blocking for the roof diaphragm especially if unsure of the blocking material or how it is being installed.
Double diagonally sheathed lumber diaphragms shall be designed and constructed in accordance with af pa sdpws.
Diaphragm and becomes one of the connections from the roof diaphragm to the shear wall.
Tongue and groove edges panel edge clips one midway between each support except two equally spaced between supports 48 inches on center lumber blocking or other.
2306 2 3 double diagonally sheathed lumber diaphragms.
Apa s diaphragms and shearwalls l350a has a good set of tables showing the strength of various blocked and unblocked sheathing methods.
To roof diaphragm at top and to foundation at bottom roof horizontal diaphragm carries load to end walls.
You then provide double the nailing requirement at the blocked bays.